欧美亚洲国产中文手机在线有码_日韩无码福利视频_成人性生交片无码免费30年老片_美女内射网站久久久精品_大陆日韩欧美经典视频一区_乱子伦av无码中文字幕_欧美猛男gay巨巴_黄片精品国产欧美_18禁在线网站点击进入_成人短视频免费在线观看

Chinese
English

Technical Support

Technical Support

How To Run The Pressure Vessel

Article Source: This Site Release Date:2019-01-02

How to run the pressure vessel

A, operation steps

1, the relevant power supply connection intact (including all kinds of metering pump, high pressure pump).

2, all piping and equipment are in front of the reverse osmosis device wash finished, and finished the debugging and running normally.

3, start-up pressure containers.

Second, the use of pressure vessel

1, start at a high pressure system, must be slowly increase the pressure, to prevent damage to the end plate, pressure vessel and even cause personnel injury.

2, ensure system device of pressure vessel with overvoltage protection (greater than 105% of the design pressure).

3, banned under the stressed state of trying to remove any part of the pressure vessel.

4, installation thrust ring operation pressure vessel is not allowed.

5, it is forbidden to work beyond the pressure vessel pressure using pressure vessel.

6, or the use of pressure vessel using temperature range beyond using pressure vessel.


All Rights Reserved: Big Couni Connect Universe Star Water Purification Equipment Co., LTD., Tel: + 86-10-6 4405570 Fax: + 4405956 4405956 4405956 Liao It For